Burlington Electric Department RFP System
RFP#032-26 5 Chargepoint Express 250 units.
RFP# 032-26
Deadline: October 28, 2025 5:00 pm
We are looking to go out for RFP to purchase 5 Chargepoint Express 250 units. There are multiple part numbers for this unit. They are: CPE250C-625-CCS1-200A-CHD o ChargePoint Express 250 Station (62.5 kW) – includes Express 250 Station, 2x Power Modules, 1x CCS1 200A cable, 1 x CHAdeMO cable, North American Modem/SIM, cUL and UL listed, requires CPE250-CMT-IMPERIAL in US. CPE250-CMT-METRIC in Canada DC-UNIVERSAL-CMT-METRIC o Required metal bracket to align conduits and mounting bolts for DC power delivery products when cable entrance is from below. This bracket is to be installed into the foundation before the concrete pad is poured. Metric Units. CPCLD-ENTERPRISE-DC-5 o 5 years of Enterprise Cloud Plan subscription with advanced station management features such as: Custom Video uploads and Automatic Software Updates, driver and fleet management. |
Documents
Submit Your Proposal