RFP#068-26 Gas Turbine Fuel Transfer Pump & Manifold Upgrade
RFP# 068-26
Deadline: May 19, 2026 5:00 pm
RFP#068-26 Gas Turbine Fuel Transfer Pump & Manifold Upgrade
The City of Burlington Electric Department invites proposals for upgrades to the fuel transfer pump and manifold at the Gas Turbine generating station.
Summary
The existing fuel transfer pump for loading in fuel from delivery trucks requires replacement. Additionally, some updates to the fuel transfer manifold are required.
Scope of Work
The scope of this project includes an updated manifold design, including new motor+pump assembly, and added valves to improve versatility for taking on fuel from trucks with or without built-in transfer pump.
Site Walkthrough
A site visit is mandatory prior to the award of the project contract. The date of the site visit is May 12, 2026, 10 am per the Proposed Schedule in Section IV. Location 124 Penny Lane Burlington, VT 05401 Please contact Lincoln Sprague to confirm you are going to the walkthrough lsprague@burlingtonelectric.com /802-207-2967 cell
Technical Proposal
This section should describe the proposer's approach and plans for accomplishing the specifications. This section should contain but is not limited to the following:
- System design – description and drawings of the updated design
- Components – make/model specification of new hardware to be installed
- A summary description of the project plan; milestone tasks with expected timeline
|
Milestone |
Date |
|
Release of Formal RFP |
April 29, 2026 |
|
Site Walkthrough |
May 12, 2026 10am EST |
|
Last Date to Submit Written Proposal |
May 19, 2026 5pm EST |
|
Selection of contractor |
May 20, 2026 |
|
Date project may begin |
May 20, 2026 |
|
Date project must be completed |
June 30, 2026 |